⑥
Cycle Time + Lead Time
Metrics
Cycle Time
(in_progress → done)
0.0
days
Median
P90
8.1d
Distribution
0-1d
1-2d
2-3d
3-5d
5-7d
7-10d
10-14
14d+
Lead Time
(created → done)
0.0
days
Median
P90
22.5d
Distribution
0-3d
3-5d
5-7d
7-10d
10-14
14-21
21-30
30d+
⑦
Status Duration Heatmap
Analysis
Average Days in Status
backlog
8.2d
in_planning
3.1d
planned
5.4d
in_progress
4.2d
review
12.7d
⚠ Bottleneck
done
—
blocked
9.5d
⑮
Risk Stack Panel
Risk
Risk Stack
5 items needing attention
Critical
LAT-18
“Add relationship validation”
Stale 12 days, in_progress, blocking 2 tasks
High
LAT-29
“Archive cascade for relationships”
Blocked, chain depth 2 (via LAT-31 → LAT-18)
High
LAT-31
“Implement blocked-by enforcement”
Blocked by stale task LAT-18
Moderate
LAT-22
“Design artifact linking UX”
Stale 14 days, planned (not blocking others)
Low
in_progress WIP exceeded (5/4) for 3 days
Capacity constraint, not directly blocking deliverables
㉓
WIP Alert Severity + Time-over-limit
Alert
WIP Limit Breach — in_progress
Warning
Current
5
Limit
4
Over By
+1
0
Capacity
Limit: 4
Feb 12 — breached
Now (3d over)
Recommendation:
Consider moving
LAT-38
to review or reassigning to reduce in_progress count below the WIP limit.
㉔
Bottleneck Detection
Insight
Bottleneck Detected:
review
ENTERING
2.1
/week avg
IN
review
accumulating
OUT
LEAVING
1.3
/week avg
+0.8/week net accumulation
Flow Ratio
0.62
< 0.8 threshold → bottleneck
Time to Critical
~3 weeks
at current rate
Accumulation Projection (next 4 weeks)
danger zone
Now
Wk 1
Wk 2
Wk 3
Wk 4
5
~8
㉕
Dependency Chain Risk
Graph
Dependency Chains
Chain 1
Critical
Depth 2
LAT-29
Archive cascade
blocked by
LAT-31
Blocked-by enforcement
blocked by
LAT-18
Relationship validation
stale 12d • ROOT CAUSE
Impact:
3 tasks affected, deepest block is stale for 12 days
Chain 2
High
Depth 1
LAT-33
Depends on validation
blocked by
LAT-18
Relationship validation
SHARED ROOT CAUSE
Impact:
Shares root cause with Chain 1 — resolving LAT-18 unblocks both chains